The construction of MIC’s new Library and Learning Resource Centre is an exciting milestone for the College, but we recognise that a project of this scale will also bring changes to day-to-day life on and around the Limerick campus.

To help, we have brought together answers to some of the most frequently asked questions about the project, including construction activity, parking and access, Library services and other practical arrangements. 

We will continue to update this section as the project progresses and new information becomes available.

Access, Parking & Getting Around Campus

Yes, about half of the on-campus car parking spaces will be unavailable for the duration of the project. 

From Tuesday 24 November, the Staff Car Park, situated opposite the current Library building (outlined in blue in the diagram below), will close and will remain closed for the duration of the construction project.

From Monday 30 November, the Paid Car Park, situated opposite the TARA Building (outlined in yellow in the diagram below), will close and will remain closed for the duration of the project.

Access & Parking (effective until January 2027)
Staff: Access Summerville front and side car parks from Courtbrack Avenue.
From the South Circular Road entrance, there are a limited number of car park spaces.
Students: Parking from now until Christmas in Summerville car park, overflow car park, as well as Park & Ride.
Visitors: Visitor parking is outside the main Foundation building only.
Contractors: Enter and leave the campus through the Courtbrack Avenue entrance only.

View Campus Map

Campus access and site map effective until January 2027.

Please note: Vehicles will not be able to travel through the campus between the South Circular Road and Courtbrack Avenue entrances.

To help minimise the inconvenience arising from the reduction in on-campus parking, MIC is increasing its free Park & Ride service from Monday 30 November.

Two buses will operate the service at approximately 30-minute intervals, providing increased capacity and more frequent connections to and from campus. Security personnel will also be present at the Park & Ride facility from 8am to 7pm, Monday to Friday. This service will be increased during peak periods as required.

These changes will significantly reduce the availability of parking on campus. Staff and students are therefore strongly encouraged to use the Park & Ride service wherever possible, to consider alternative travel arrangements where feasible, and to allow additional time for travel and parking.

Park & Ride Schedule

Park & Ride Drop-off / Collection Point
Limerick Greyhound Stadium
Dock Road
Limerick
V94 Y17X

Some pedestrian routes may change during the construction period due to the location of the new building and associated construction activities.

Temporary diversions may be introduced to maintain safe access around the site.

Please follow all directional signage and use the designated pedestrian routes. Do not walk through construction areas or attempt to bypass safety barriers.

Yes, if your usual route is affected by construction works, temporary access signage will be provided for alternative routes.

Teaching, Learning & Working

MIC recognises the importance of ensuring that students can access examinations in a timely manner. To support this, additional Park & Ride capacity will be provided during peak periods and every effort will be made to minimise the risk of delays for students attending examinations.

The current library will continue to function as is until completion of the new library building.

Noise, Dust & Construction Activity

The agreed construction working hours are:

  • Monday to Friday: 8am - 6pm
  • Saturday: 8am - 2pm
  • Sundays and public holidays: No routine construction works are scheduled.

These hours represent the normal agreed working arrangements for the project. Any works proposed outside these hours will be subject to the appropriate approval and arrangements in accordance with applicable planning conditions and project requirements.

Staff and students should be aware that construction-related noise and activity may be noticeable during these times.

As with any major construction project, some noise and disruption should be expected during the construction of the new library.

The level of noise will vary depending on the stage of construction and the activities being undertaken. Certain phases, such as demolition, excavation, groundworks and structural construction, may generate higher levels of noise than others.

The appointed contractor will be expected to manage construction activities to minimise noise and disruption to the surrounding college buildings and activities as far as reasonably practicable.

Where reasonably practicable, consideration will be given to the College's academic calendar, including examination periods and other significant college activities, when planning particularly noisy construction works.

The College will liaise with the appointed contractor and project management team to identify activities or periods where noise disruption could have a significant impact on teaching, learning or examinations.

Where particularly disruptive works are anticipated, efforts will be made to plan and coordinate these activities to minimise disruption to the College community.

The appointed contractor will be responsible for implementing appropriate control measures to minimise the impact of noise, dust and other construction-related activities.

These measures may include:

  • Using suitable dust suppression methods during activities that generate dust.
  • Maintaining appropriate site hoarding and barriers to help contain dust and debris.
  • Regular cleaning of construction areas and surrounding access routes.
  • Maintaining construction equipment and machinery to minimise unnecessary noise.
  • Managing the timing and sequencing of particularly noisy activities where reasonably practicable.
  • Monitoring and addressing any complaints or concerns relating to noise, dust or construction activities.

The contractor will be expected to comply with relevant health and safety, environmental and statutory requirements throughout the project.

Yes – Levitt Bernstein Landscape Architects were engaged by the College early in the process and assisted in the preparation of a detailed Landscape Masterplan Report. This report pays due heed to the impact the project may have on flora and fauna and sets out the final vision of how the campus will look upon completion of the project including the external landscaping works.

Fire Safety and Emergency Procedures

There will be some changes to the location of designated fire assembly points due to the footprint of the new library development.

Two existing fire assembly points located at the front of the old library will be affected by the construction works and will no longer be available.

Staff, students and visitors should familiarise themselves with the alternative designated fire assembly points, which include:

  • The fire assembly point to the rear of the library.
  • The fire assembly point at the front entrance of the Tara Building, beside the Students' Union.

Please ensure you know the location of your nearest available fire assembly point and follow any updated signage or instructions from Fire Wardens and college personnel.

In the event of a fire alarm, leave the building promptly using the nearest safe and available emergency exit.

Proceed to your nearest designated fire assembly point, taking account of any temporary changes resulting from the construction works.

Do not make your way towards the two fire assembly points at the front of the old library, as these will be within the construction footprint.

Some external routes in the vicinity of the library may be affected by the construction works. Any changes to pedestrian access or emergency exit arrangements will be communicated through appropriate signage and college communications.

Staff and students should remain alert to temporary signage and follow the directions provided.

Yes, all staff and students are asked to familiarise themselves with their nearest available fire assembly point.

Please take a few minutes to identify the alternative assembly points at the rear of the library and the front entrance of the Tara Building, beside the Students' Union.

Accessibility and Disability Arrangements

There should be no overall change to college arrangements for people with disabilities.

However, some temporary changes to pedestrian routes may be necessary while construction is underway. Where required, alternative accessible routes will be established through the Students' Union entrance at the Tara Building, with access to the lift where appropriate.

The College will endeavour to maintain safe and accessible routes throughout the project.

If your usual route is affected by construction works, please follow the temporary access signage and use the alternative route provided.

Where access is required through the Tara Building, the Students' Union entrance and lift should be used.

If you experience difficulties accessing any part of the college due to the construction works, please contact the relevant college department for assistance.

Construction Site Safety and Restricted Areas

Yes, all designated construction areas are strictly off-limits to students, staff and members of the public unless they have been specifically authorised to enter.

Construction areas will be clearly identified using the appointed contractor's branding, site hoarding, barriers and appropriate safety signage.

Under no circumstances should students, staff or members of the public enter these restricted areas.

The construction site will be clearly identifiable through the contractor's branding, site fencing, barriers and warning signage.

Please pay attention to all safety notices and physical barriers and do not attempt to cross into or bypass any restricted area.

No, access to the construction site is strictly prohibited unless formally authorised.

This includes entering the site to retrieve personal belongings, take photographs, access equipment or use the area as a shortcut.

If you need to retrieve an item that has been left within the construction site, please contact the appropriate college representative.

No, construction areas are restricted to authorised construction personnel and other individuals who have been formally permitted to enter.

Visitors and members of the public must remain within designated college access areas and follow all safety signage.

Pedestrian Access and General Safety

Some pedestrian routes may change during the construction period due to the location of the new building and associated construction activities.

Temporary diversions may be introduced to maintain safe access around the site.

Please follow all directional signage and use the designated pedestrian routes. Do not walk through construction areas or attempt to bypass safety barriers.

Yes., while construction is underway, everyone on campus is asked to:

  • Remain within designated pedestrian walkways.
  • Observe all temporary signage and safety notices.
  • Keep clear of construction fencing, barriers and machinery.
  • Never enter restricted construction areas.
  • Be mindful of construction vehicles and deliveries operating in the vicinity.
  • Follow instructions issued by college staff, Fire Wardens and the appointed contractor.

If you identify a potential safety hazard, damaged barrier, unsecured access point or other concern relating to the construction works, please report it as soon as possible by emailing: LibraryProject@mic.ul.ie.

Do not attempt to resolve the issue yourself or enter the construction site to investigate.

Yes, any significant changes to pedestrian access, fire evacuation arrangements or other health and safety procedures will be communicated to staff and students through the appropriate college communication channels.

Please keep up to date with college announcements and pay attention to notices displayed around the campus.

About the Project

The proposed development comprises construction of a new Library building extending to 4,633 square metres (including a stand-alone substation of 28 square metres) and retention and refurbishment of 306 square metres of part of the existing Library building, incorporating this element with the adjoining Tara building. The new Library and Learning Resource Centre will comprise of approximately 675 formal and informal reading spaces with a repository of teaching practice materials, a collection of children’s books and other flexible spaces to support multiple uses. The College also intends to provide a Special Books Collection with a controlled environment and an Audio-Visual Library with recording studios and editing suites. This state-of-the-art Library and Learning Resource Centre will provide effective access to a wide range of technologies which underpin current and future learning.

The development also includes some services and utilities diversion and vegetation removal to enable the development site and, subsequent to completion of the new building, the demolition of most of the old Library building and the development of a plaza area in that location.

  • Mary Immaculate College is the Client for this project.
  • John Sisk & Son (Holdings) Ltd. are the appointed building contractors.
  • MKO, Galway will act as Project Coordinator.
  • AECOM will lead the Project Management Team and act as Employer’s Representative, Cost Managers and Assigned Certifier.
  • Scott Tallon Walker architects will lead the Single Point Design Team.

This project was granted planning authorisation on 23 Feb 2024 by Limerick City and County Council. Planning Register Number: 23/60965. This took place following a period of consultation with stakeholders both internal and external to the College.

Site preparation will commence on 24 November with construction commencing on 4 Jan 2027.

The project is divided into two phases. 

Phase 1 of the project, construction of the new building, will be followed by a period to decant all stock from the old library. 

Phase 2 will then take place wherein part of the old library will be demolished and works will take place to refurbish an existing lecture theatre and the new outdoor plaza area.   

It is envisaged that construction will take 18 months, but the entire project will be complete within two years

A dedicated email address, LibraryProject@mic.ul.ie, is the main contact point for the project. This email will be used to provide updates as the project progresses and to receive and direct queries throughout the project.

If you are a neighbour who would like to stay up to date on relevant activities happening in MIC, including the new library development, email MICNeighbours@mic.ul.ie and we will add you to our Community Newsletter.

The project contractors will be onsite between 8am to 6pm (Mon to Friday) and 8am to 2pm (Saturday).

If you have any additional queries, please email LibraryProject@mic.ul.ie.